题目内容 (请给出正确答案)
[主观题]

After issuing the show interfaces terse command, you notice that the status of one interface is "up down". What does this indicate?"()

A.Layer 1 on the interface is up but Layer 2 is down.

B.Layer 2 on the interface is up but Layer 3 has not been configured.

C.The interface is administratively up but the link status is down.

D.The interface is up but has been administratively turned off.

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“After issuing the show interfa…”相关的问题

第1题

If an applicant requests that the credit expires for presentation at the Issuing Bank with drafts dr
awn on the Issuing Bank 90 days after sight, how the credit be made available?

(1)( ) by sight payment

(2)( ) by deferred payment

(3)( ) by acceptance

(4)( ) by negotiation

点击查看答案

第2题

If an applicant requests that the credit expires for presentation at the Issuing Bank with
drafts drIf an applicant requests that the credit expires for presentation at the Issuing Bank with drafts drawn on the Issuing Bank 90 days after sight, how the credit be made available () by negotiation

点击查看答案

第3题

A credit that will become available for presentation of shipping documents to the Issuing Bank only
after it has received and approved a performance guarantee is usually described as

(1)( ) Standby.

(2)( ) Revocable.

(3)( ) Inoperative.

(4)( ) Advance payment.

点击查看答案

第4题

The bank which advises the exporter of its receipt of the credit after examining it is
called .

A、the issuing bank

B、the establishing bank

C、opening bank

D、the advising bank

点击查看答案

第5题

汇票练习题(第一题8分,第二题4分,共12分) A draft for USD108,520.OO is drawn by The American Exporter Co. Inc. Tampa, Florida, U .S .A on the French Issuing Bank ,Paris, France payable at 9O days after sight to the order of ABC Company dated April 25,2019 marked "Drawn under The French Issuing Bank, Paris, France L/C No.12345 dated April 1,2019 ". Exchange for____(1)___ (2) , (3) At ________(4)______after sight pay to the order of___(5)___ the sum of _____________
点击查看答案

第6题

A beneficiary has presented a full set of documents under a credit provided for deferred payment at
180 days after B/L date to the nominated bank, it examined documents which were complied with the terms and conditions of the credit, it incurred a deferred payment undertaking and at the request of beneficiary, it has discounted and prepaid net amount to the beneficiary, then it sent a full set of documents by courier to the issuing bank for reimbursement at maturity. After some days nominated bank discovered that beneficiary has escaped for his delivery of a part of forgery documents.

A. On the maturity date in accordance with UCP 500 Article 9ii and Article 15, issuing bank ______ to the nominated bank.

B. On the maturity date in accordance with UCP 600 Article 7aIII, 7c and Article 12b, the issuing bank ______ to the nominated bank, because UCP 600 Article 7c stipulates: "An issuing bank's undertaking to reimburse a nominated bank is independent of the issuing bank's undertaking to the beneficiary. "

点击查看答案

第7题

After issuing the "show version" command on your Cisco router, you notice that the image is named "C7200-ajs40-mx". What does the C7200 portion of the filename represent?()

A. The memory capacity requirements

B. The hardware product platform

C. The distribution channel

D. The feature capabilities

E. The run location and compression status

点击查看答案

第8题

A credit was issued by ABC Bank Limited on 01-10-2008 and was confirmed by XYZ Bank Limited. The cre
dit was "30 days after sight" available with the confirming bank by acceptance. On presentation of the documents to the confirming bank on 01-11-2008, the confirming bank communicated its acceptance to the beneficiary on the same day and forwardered the documents to the issuing bank. The issuing bank communicated its acceptance on 05-11-2008.

Which one is the correct maturity date under the presentation?

(1)( ) 31st October 2008.

(2)( ) 1st December 2008.

(3)( ) 5th December 2008.

(4)( ) None.

点击查看答案

第9题

As ______ , we take pleasure in offering you, subject to our final confirmation, 300 dozen of deersk
in handbags style No. MA 190 at $124. 00 per dozen CIF Hamburg. Shipment will be effected within 25 days after receipt of the relevant L/C ______ by your first class bank in our favour upon signing sales contract.

A.requesting, issuing B.requesting, issued

C.requested, issued D.requested, issuing

点击查看答案

第10题

Terms of Payment By irrevocable letter of credit for 90% of the total invoice value of the goods to

Terms of Payment

By irrevocable letter of credit for 90% of the total invoice value of the goods to be shipped, in favor of the Sellers, payable at the issuing bank against the Sellers'draft at sight accompanied by the shipping documents stipulated in the Credit. The balance of 10% of the proceeds is to be paid only after the goods have been inspected and approved at the port of destination.

点击查看答案

第11题

You issue the following RMAN command to set a retention policy on a database:RMAN>CONFIGURE RETENTION POLICY TO REDUNDANCY 2;What will be the outcome of issuing this command? ()

A. After two days, a backup will be marked obsolete

B. After two days, a backup will be deleted from the media

C. If the RMAN repository has records of two or more recent backups of a file, then older backups will be deleted from the media.

D. If the RMAN repository has records of two or more recent backups of a file, then older backups will be marked obsolete.

点击查看答案
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信