165Budgetary estimates are the output of the _____ phase(s) of the project. A.conceptual B
165 Budgetary estimates are the output of the _____ phase(s) of the project.
A. conceptual
B. development
C. implementation
D. finish
E. All of the above
165 Budgetary estimates are the output of the _____ phase(s) of the project.
A. conceptual
B. development
C. implementation
D. finish
E. All of the above
第1题
It is very difficult for the time being to ________ how much money is needed.
A. account
B. assume
C. ranges
D. estimat
第2题
The Delphi Method is well-suited for:
A . Decision-making
B . Forecasting
C . Overhead rate estimating
D . All of the above
E . A and B only
第3题
● Going from Level 2 to Level 4 in the work breakdown structure will result in
A Less estimating accuracy
B Better control of the project
C Lower status reporting costs
D A greater likelihood that something will fall through the cracks
E None of the above
第4题
55 The most precise or accurate estimate for determining project costs is the _____ estimate. A. Definitive.
B. Analogy
C. Budget
D. Modified standards.
E. Rule of thumb