题目内容 (请给出正确答案)
[主观题]

●A project manager believes that modifying the scope of the project may provide added valu

● A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A Change the scope baseline

B Prepare a variance report

C Call a meeting of the configuration control board

D Change the project's objectives

E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“●A project manager believes th…”相关的问题

第1题

●The scope baseline/project charter is prepared by the:AProject managerBProject manager an

● The scope baseline/project charter is prepared by the:

A Project manager

B Project manager and project office

C Project manager, project office and functional team

D Project manager, project office, functional team and project sponsor

E Project manager, project sponsor and customer/user

点击查看答案

第2题

n.经理,管理人()

A.project

B.manager

C.ivilization

D.Jesus

点击查看答案

第3题

The quality objectives are approved in the conceptual stage of the project by the:A.Projec

The quality objectives are approved in the conceptual stage of the project by the:

A . Project Engineer

B . Project Manager

C . Functional Manager

D . Quality Assurance Manager

E . Project Owner

点击查看答案

第4题

The main player in project communication is theAsponsorBproject managerCfunctional manager

The main player in project communication is the

A sponsor

B project manager

C functional manager

D functional team

E All of the above.

点击查看答案

第5题

本课程中PM是什么的缩写?

A.Project Manager

B.Primary Manager

C.Product Manager

D.Particulate Matter

点击查看答案

第6题

●Interfacing with the customer after project go-ahead is the responsibility of:AProject sp

● Interfacing with the customer after project go-ahead is the responsibility of:

A Project sponsor

B Project team

C Project manager

D Functional manager

E All of the above are possible, based upon the size and complexity of the project

点击查看答案

第7题

93When a project manager is running over the budgeted costs, the project manager can typic

93 When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.

A. Reduce features and/or functionality

B. Increase risk.

C. Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)

D. All of the above.

E. A and B only

点击查看答案

第8题

Of the following, who has the ultimate responsibility for meeting project quality objectiv
es?

A . Project Engineer

B . Project Manager

C . Functional Manager

D . Quality Assurance Manager

E . Project Owner

点击查看答案

第9题

An effective Project Manager does not share project _____ with the team members.AVisionBre

An effective Project Manager does not share project _____ with the team members.

A Vision

B responsibility

C solution to problems

D accountability

E status

点击查看答案

第10题

A project manager trying to communicate accurately to the team should use:Athe language of

A project manager trying to communicate accurately to the team should use:

A the language of the team members

B the language of the project manager

C non-verbal methods

D written memos

E All of the above.

点击查看答案

第11题

The core function of the project manager isA.Systems designB.Client interfacingC.Quality a

The core function of the project manager is

A . Systems design

B . Client interfacing

C . Quality assurance

D . integration

点击查看答案
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信