题目内容 (请给出正确答案)
[主观题]

Beta and standard deviation differ as risk measures in that beta measures______.A.only uns

Beta and standard deviation differ as risk measures in that beta measures______.

A.only unsystematic risk, while standard deviation measures total risk

B.only systematic risk, while standard deviation measures total risk

C.both systematic and unsystematic risk, while standard deviation measures only unsystematic risk

D.both systematic and unsystematic risk, while standard deviation measures only systematic risk

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“Beta and standard deviation di…”相关的问题

第1题

The de facto standard Application Program Interface (API) for TCP/IP applications is the “

The de facto standard Application Program Interface (API) for TCP/IP applications is the “sockets” interface. Although this API was developed for (71) in the early 1960s it has also been implemented on a wide variety of no-Unix systems. TCP/IP (72) Written using the sockets API have in the past enjoyed a high degree of portability and we would like the same (73) with IPv6 applications. But changes are required to the sockets API to support IPv6 and this memo describes these changes. These include a new socket address structure to carry IPv6 (74) ,new address conversion functions, and some new socket options. These extensions are designed to provide access to the basic IPv6 features requited by TCP and UDP applications, including multicasting, while introducing a minimums of change into the system and providing complete (75) for existing IPv4 applications.

A.Windows

B.Linux

C.Unix

D.DOS

点击查看答案

第2题

Cisco路由器执行show access-list命令显示如下一组控制列表信息: Standard IP acceSS list 30 de

Cisco路由器执行show access-list命令显示如下一组控制列表信息:

Standard IP acceSS list 30

deny 127.0.0.0,wildcard bits 0.255.255.255

deny 172.16.0.0,wiidcard bits 0.15.255.255

permft any

根据上述信息,正确的access-list配置是______。

A) Router(config)#access-list 30 deny 127.0.0.0 255.255.255.0

Router(config)#access-list 30 deny 172.16.0.0 255.240.0.0

Router(config)#access-list 30 permit any

B) Router(config-std-nacl)#access-list 30 deny 127.0.0.0 0.255.255.255

Router(config-std-nael)#access-list 30 deny 172.16.0.0 0.15.255.255

Router(config-std-nacl)#access-list 30 permit any

C) Router(config)#access-list 30 deny 127.0.0.0 0.255.255.255

Router(config)#access-list 30 deny 172.16.0.0 0.15.255.255

Router(config)#access-list 30 permit any

D) Router(config)#access-list 30 deny 127.0.0.0 0.255.255.255

Router(config)#access-list 30 permit any

Router(config)#access-list 30 deny 172.16.0.0 0.15.255.255

点击查看答案

第3题

●For nearly ten years, the Unified Modeling Language (UML) has been the industry standard

● For nearly ten years, the Unified Modeling Language (UML) has been the industry standard for visualizing, specifying, constructing, and documenting the (71)of a software-intensive system. As the (72)standard modeling language, the UML facilitates communication and reduces confusion among project (73)The recent standardization of UML 2.0 has further extended the language's scope and viability. Its inherent expressiveness allows users to(74)everything from enterprise information systems and distributed Web-based applications to real-time embedded systems. The UML is not limited to modeling software. In fact, it is expressive enough to model (75) systems,such as workflow in the legal system, the structure and behavior. of a patient healthcare system, software engineering in aircraft combat systems, and the design of hardware. To understand the UML, you need to form. a conceptual model of the language, and this requires learning three major elements: the UML's basic building blocks, the rules that dictate how those building blocks may be put together, and some common mechanisms that apply throughout the UML.

(71)

A. classes

B. components

C. sequences

D. artifacts

(72)

A. real

B. legal

C. de facto

D. illegal

(73)

A. investors

B. developers

C. designers

D. stakeholders

(74)

A. model

B. code

C. test

D. modify

(75)

A. non-hardware

B. non-software

C. hardware

D. software

点击查看答案

第4题

使用美国的银行承兑汇票融通资金,可以选择做融资的下列出口货运: On 10 August, Bank of Asia, London rec

使用美国的银行承兑汇票融通资金,可以选择做融资的下列出口货运:

On 10 August, Bank of Asia, London received a cable despatched by Bank of Asia, Hangzhou inclusive of the following contents:

Description

of goods

Shipment

from ______ to ______

B/L

date

ETAAmount
Silk

Chemicals

Piece goods

Poplin

China

China

China

China

Tunis

Singapore

Egypt

Rangoon

1 Aug.

2 Aug.

5 Aug.

1 Aug.

20 Sep.

13 Aug.

20 Sep.

12 Aug.

USD1,500,000.00

250,000.00

1,500,000.00

150,000.00

Total USD3, 400, 000. 00

(1)计算实际利率,确定是否可做银行承兑汇票(Banker's Acceptance, B/A)融资。

Bank of Asia, London telephoned Chemical Bank, London to enquire about all-in- rate on the same date which was 13.4% per annum. Another enquiry about LIBOR from Euro-dollar market has been made, the result was 14. go-/o for six months.

Whether such all-in-rate is available to create the banker's acceptance at 180 days?

Effective annual rate =

As the effective annual rate at ______ was ______ than LIBOR at ______, Bank of Asia, London would apply for the creation of eligible banker's acceptance.

(2)亚(洲银)行伦敦分行折算后认为可以叙做B/A,于8月10日发电给化学银行伦敦分行,请它转电该行纽约分行,将两笔货运金额融资,并请承兑和贴现,将净款贷记亚行账户。

Bank of Asia, London selected some of the above exportation with ETA exceeding 5 days as from 10 Aug., to be available to B/A, and made a telex advice of application for B/A dated 10 Aug., at 180 days to Chemical Bank, London as follows:

FROM:__________________

TO: __________________

TEST 2476 WE CONFIRM TODAY'S USD BANKER'S ACCEPTANCE TRANSACTION OF USD ______ VALUE 10 AUG. FOR ______ DAYS AT ______ PER ANNUM PLEASE INSTRUCT YOUR NEW YORK OFFICE TO FILL OUT OUR PRESIGNED BANK DRAFT ACCEPTED AND DISCOUNTED AND ______ NET PROCEEDS AMOUNTING TO USD ______ TO OUR ACCOUNT WITH THEM STOP

THIS FINANCING COVERS THE FOLLOWING TRANSACTIONS

DESCRIPTION

OF GOODS

SHIPMENT

FROM

SHIPMENT

TO

B/L DATEETAAMOUNT
______

______

______

______

______

______

______

______

______

______

______

______

______

WE ALSO CONFIRM THAT GOODS ARE IN CHANNEL OF TRADE NO OTHER FINANCING IS INVOLVED WITH THE TRANSACTION AT MATURITY ______ WE SHALL PAY FACE AMOUNT TO YOU TO LIQUIDATE THIS OUTSTANDING ACCEPTANCE.

(3)承兑行代为填写预签汇票,制成承兑和可贴现汇票。化学银行纽约分行当天回电致其伦敦分行确认承兑、贴现,并将净款贷记在亚行伦敦分行账户上。

Please fill out a presigned blank draft with the following particulars:

dates of draft and of acceptance: 10 Aug.

amount: USD3,000,000.00

No. of draft: 101

drawee: Chemical Bank, New York

drawer: Bank of Asia, London

payee: Chemical Bank

tenor: at 180 days after sight

exportation of silk and piece goods from China to Tunis and Egypt

On 10 Aug., Chemical Bank, New York replied to their London office for relay to Bank of Asia, London by telex, confirming that the net proceeds have been credited to Bank of Asia, London's account maintained with them.

FROM: CHEMICAL BANK, NEW YORK

TO: CHEMICAL BANK, LONDON

MESSAGE FOR BANK OF ASIA, LONDON

WE HAVE ACCEPTED AND DISCOUNTED DRAFT NO. 101 NET PROCEEDS

USD ______ BEING SAME DAY FUNDS CREDITED YOUR ACCOUNT

(4)亚行伦敦分行电传给化学银行伦敦分行,请它通知其纽约分行将净款付给纽约渣打银行。

On 11 Aug., Bank of Asia, London telexed Chemical Bank, London to instruct their New York Office to transfer the net proceeds for the credit of Standard Chartered Bank, New York.

FROM:__________________

TO: __________________

MESSAGE FOR CHEMICAL BANK, NEW YORK

VALUE 10 AUG. PLEASE ______ OUR ACCOUNT WITH OUR NEW

YORK OFFICE AND PAY ______________________________

FOR THE ______ OF OUR ACCOUNT WITH THEM AMOUNTING USD

______.

(5)亚行伦敦分行贷款300万美元给布鲁塞尔的布(鲁塞尔)行,并从纽约渣打银行拨款给布行。

On 12 Aug., Bank of Asia, London has made a loan to Banque de Bruxelles, S.A. Brussels for the amount of USD3,000,000.00 at 14.9% per annum valued on 12 Aug., matured at 6 Feb., with a loan period of 178 days. They have telexed Standard Chartered Bank, New York to pay the said amount to Manufacturers Hanover Trust Co., New York for the credit of the account of Banque de Bruxelles.

FROM: ________________________

TO: ________________________

TEST 1552 VALUE ______ PLEASE ______

OUR ACCOUNT AND PAY __________________

__________________ FOR THE ____________

OF THE ACCOUNT OF BANQUE DE BRUXELLES USD ______

______

(6)布鲁塞尔的布行寄送借款确认书给亚行伦敦分行。

Banque de Bruxelles, S.A. Brussels sent a confirmation of borrowing to Bank of Asia, London with some items in blank to be filled in a8 follows:

Confirmation of Borrowing

To Bank of Asia, London Date 12 Aug.

Date of borrowing ______ Amount ______

Maturity ______ Interest rate at ______

Interest amount ______

In our favour with

Manufacturers Hanover Trust Co., New York

Liquidation at maturity ______

Total amount to be paid ______

Payment through

Manufacturers Hanover Trust Co., New York

With Standard Chartered Bank, New York

Banque de Bruxelles, Brussels

signature

(7)布行在到期日发出电传给纽约汉华银行将贷款本息还给亚行伦敦分行。

At maturity, Banque de Bruxelles, Brussels telexed Manufacturers Hanover Trust Co., New York to refund the principal and interest of the loan to Bank of Asia, London.

FROM: ________________________

TO: ________________________

VALUE ______ PLEASE ______ OUR ACCOUNT AND PAY

______ TO THE STANDARD CHARTERED BANK NEW YORK FOR

______ OF THE ACCOUNT OF ______ WITH THEM

(8)在银行承兑汇票到期日,亚行伦敦分行发出电传给纽约渣打银行付款 300万美元。

On due date Bank of Asia, London telexed the Standard Chartered Bank, New York to pay USD3,000,000.00 to Chemical Bank, New York to liquidate the outstanding acceptance.

FROM: ______________________________

TO: ______________________________

VALUE ______ PLEASE ______ OUR ACCOUNT AND PAY

______ TO ______ FOR ______ TO THEIR ______

ACCOUNT TO LIQUIDATE OUR BANKER'S ACCEPTANCE NO. ______

MATURING AT ______.

(9)计算亚行伦敦分行发放贷款获得的利润(利息差额收益)。

Bank of Asia, London has obtained profit of interest difference between the rates of loan and B/A as follows:

Loan interest amount: USD ______

B/A discount and acceptance charges: USD ______

______________________________

Profit of interest difference: USD ______

点击查看答案

第5题

要实现使 BETA 的值为 56,应采用语句为()

A.BETA DB 56

B.BETA DB 56H

C.BETA EQU 56

D.BETA EQU 56H

点击查看答案

第6题

Beta测试是集成测试的一种
点击查看答案

第7题

定义alpha测试和beta测试的区别。
点击查看答案

第8题

通过BETA理财师转发投教内容不包含哪种方式()

A.BETA理财师资讯大类中转发

B.百度相关内容后跳转BETA理财师转发

C.微信公众号的文章跳转BETA理财师转发

D.今日头条的文章跳转BETA理财师转发

点击查看答案

第9题

股票beta会随着时间的推移而发生变动
点击查看答案
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信