● The earned value technique is a commonly used method of performance measurement. It inte

grates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index(SPI=EV/PV) value less than 1.0, it means that __(74)__.

(74)A.the project is ahead of its planned schedule

B.less work was completed than was planned

C.the cost overrun for work completed

D.the cost under-run of performance to date

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“● The earned value technique i…”相关的问题

第1题

The ability to achieve cost savings is inversely proportional to _____.A.the earned value

The ability to achieve cost savings is inversely proportional to _____.

A.the earned value achieved to date

B.the estimated costs to complete

C.empowerment to the P.M.

D.productivity

E.None of the above.

点击查看答案

第2题

()is a measure of schedule performance expreessed as the difference between the earned
()is a measure of schedule performance expreessed as the difference between the earned value and the planned value.

A、Schedule varlance (SV)

B、Cost varlance (CV)

C、Actual cost (AC)

D、Earned value (EV)

点击查看答案

第3题

130The ability to achieve cost savings is inversely proportional to _____. A.the earned va

130 The ability to achieve cost savings is inversely proportional to _____.

A. the earned value achieved to date

B. the estimated costs to complete

C. empowerment to the P.M.

D. productivity

E. None of the above

点击查看答案

第4题

24A comparison of completion status to baseline is referred to as _____. A.Earned value me

24 A comparison of completion status to baseline is referred to as _____.

A. Earned value measurement.

B. Percent complete.

C. ACWP.

D. BCWS

E. None of above

点击查看答案

第5题

48The ability to achieve cost savings is inversely proportional to _____. A.the earned val

48 The ability to achieve cost savings is inversely proportional to _____.

A. the earned value achieved to date

B. the estimated costs to complete

C. empowerment to the P.M.

D. productivity

E. None of the above

点击查看答案

第6题

项目成本控制的一种重要方法是挣值分析法,挣值管理(Earned Value Management)是综合了项目范围、

项目成本控制的一种重要方法是挣值分析法,挣值管理(Earned Value Management)是综合了项目范围、进度计划和资源、测量项目绩效的一种方法,如下图,当出现(53)时,说明工程滞后。

项目成本控制的一种重要方法是挣值分析法,挣值管理(Earned Value Management)是

A.SV>0

B.SV<0

C.CV>0

D.CV<0

点击查看答案

第7题

The cost performance index(CPI) is the ratio of earned value to () and can be used to esti
mate the projected cost of completing the project.

A.cost variance

B.planned cost

C.planned cost

D.actual cost

点击查看答案

第8题

A graphical display of accumulated costs and labor hours for both budgeted and actual cost
s, plotted against time, is called a(n) _____.

A . Trend line.

B . Trend analysis.

C . S curve.

D . Percent completion report.

E . Earned value report.

点击查看答案

第9题

46Graphical displays of accumulated cost and labor hours, plotted as a function of time, a

46 Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called: A. Variance reports

B. S curves

C. Trend analysis

D. Earned value reporting

E. Baseline control

点击查看答案

第10题

The earned value technique is a commonly used method of performance measurement.It integr
ates project scope,schedule,and cost measures to help the project management team assess project performance.If a project’s Cost Performance Index(CPI=EV/AC)value less than 1.0,it means that()。 A.the cost savings for work completed B.the project is ahead of its planned schedule C.the cost overrun for work completed D.1ess work was completed than was planned

点击查看答案
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信