题目内容 (请给出正确答案)
[主观题]

Production manager: introduced quality control resulting in decreasing working hours by 20% while in

creasing productility by 25%.
查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“Production manager: introduced…”相关的问题

第1题

In deciding whether to add or delete a product, the salary of the plant manager is an ________. Assume the plant manager supervised the production of several products.

A.avoidable fixed cost

B.avoidable variable costt

C.unavoidable fixed cost

D.unavoidable variable cost

点击查看答案

第2题

The purpose of configuration management is to:A.insure drawings are updatedB.control chang

The purpose of configuration management is to:

A.insure drawings are updated

B.control change throughout the project

C.control change during the production only

D.generate engineering change proposals

E.inform. the project manager of changes

点击查看答案

第3题

You are using recovery Manager (RMAN) with a recovery catalog to backup up your production

You are using recovery Manager (RMAN) with a recovery catalog to backup up your production database. The backups and the archived redo log files are copied to a tape drive on a daily basis. The database was open and transactions were recorded in the redo logs. Because of fire in the building you lost your servers having the production database and the recovery catalog database.The archive log files generated after the last backup are intact on one of the remote locations. While performing a disaster recovery of the production database what is the next step that you must perform after restoring the data files and applying archived redo logs?()

A. Open the database in NORMAL mode

B. Open the database in read-only mode

C. Open the database in RESTRICTED mode

D. Open the database with the RESETLOGS option

点击查看答案

第4题

115The purpose of configuration management is to: A.insure drawings are updated B.control

115 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes

点击查看答案

第5题

65Two sources of variation in the length of hex bolts exist. Production variation and meas

65 Two sources of variation in the length of hex bolts exist. Production variation and measurement error. The QC manager knows that the standard deviation from these sources is 0.24" and 0.43" , respectively. What is the total standard deviation.

A. .10 inch.

B. .19 inch.

C. .34 inch.

D. .49 inch.

E. .67 inch.

点击查看答案

第6题

183Two sources of variation in the length of hex bolts exist. Production variation and mea

183 Two sources of variation in the length of hex bolts exist. Production variation and measurement error. The QC manager knows that the standard deviation from these sources is 0.24" and 0.43" , respectively. What is the total standard deviation.

A. .10 inch.

B. .19 inch.

C. .34 inch.

D. .49 inch.

E. .67 inch

点击查看答案

第7题

You are using Recovery Manager (RMAN) with a recovery catalog to back up your production d

You are using Recovery Manager (RMAN) with a recovery catalog to back up your production database. The backups and the archived redo log files are copied to a tape drive on a daily basis. Because of media failure, you lost your production database completely along with the recovery catalog database. You want to recover the target database and make it functional. You consider performing the following steps to accomplish the task:Which option illustrates the correct sequence that you must use?()

You are using Recovery Manager (RMAN) with a recov

A. 8, 1, 3, 2, 4, 5, 7, 6

B. 1, 8, 3, 4, 2, 5, 7, 6

C. 1, 3, 4, 2, 8, 5, 6, 7

D. 1, 3, 2, 4, 6, 5, 7, 8

点击查看答案

第8题

You are using a recovery catalog to maintain Recovery Manager (RMAN) backup information fo

You are using a recovery catalog to maintain Recovery Manager (RMAN) backup information for yourproduction database. You have registered your production database and are performing regular backups.Because of a new requirement you have added a few new tablespaces to your production database and youwant them to be included in backups.Identify two options for completing this task. ()(Choose two.)

A. Reregistering the target database in recovery catalog

B. Transporting the new tablespaces to the recovery catalog database

C. Syncronizing the recovery catalog with the target database control file

D. Performing a fresh backup of the target database to include the new data files in the catalog database

点击查看答案

第9题

●The purpose of configuration management is to:Ainsure drawings are updatedBcontrol change

● The purpose of configuration management is to:

A insure drawings are updated

B control change throughout the project

C control change during the production only

D generate engineering change proposals

E inform. the project manager of changes

点击查看答案

第10题

Two sources of variation in the length of hex bolts exist. Production variation and measur
ement error. The QC manager knows that the standard deviation from these sources is 0.24" and 0.43" , respectively. What is the total standard deviation.

A . .10 inch.

B . .19 inch.

C . .34 inch.

D . .49 inch.

E . .67 inch.

点击查看答案
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信