题目内容 (请给出正确答案)
[主观题]

Bao Capital issues a 4-year semiannual-pay bond with a face value of $10 million and

a coupon rate of 10%.The market interest rate is 11% when the bond is issued.The balance sheet liability at the end of the first semiannual period is closestto:

A.$9,650,700.

B.$9,683,250.

C.$9,715,850.

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“Bao Capital issues a 4-year se…”相关的问题

第1题

Bao Capital issued bonds in 2006 that mature in 2016. The measurement basis used for
the bonds on the 2008 balance sheet will be:

A. market value.

B. historical cost.

C. amortized cost.

点击查看答案

第2题

Bao Capital issed a 5-year, $50 million face, 6% semiannual bond when market interest

Bao Capital issed a 5-year, $50 million face, 6% semiannual bond when market interest rates were 7%.The market yield of the bonds was 8% at the beginning of the next year.What is the initial balance sheet liability, and what is the interest expense that the company should report for the first half of the second year of the bond’s life (the third semiannual period)”

Bao Capital issed a 5-year, 50 million face, 6% se

点击查看答案

第3题

semiannual
Bao Capital issed a 5-year, $50 million face, 6% semiannual bond when market interest

Bao Capital issed a 5-year, $50 million face, 6% semiannual bond when market interest rates were 7%.The market yield of the bonds was 8% at the beginning of the next year.What is the initial balance sheet liability, and what is the interest expense that the company should report for the first half of the second year of the bond’s life (the third semiannual period)”

Bao Capital issed a 5-year, 50 million face, 6% se

点击查看答案

第4题

(c) Explain the capital gains tax (CGT) and income tax (IT) issues Paul and Sharon should

(c) Explain the capital gains tax (CGT) and income tax (IT) issues Paul and Sharon should consider in deciding

which form. of trust to set up for Gisella and Gavin. You are not required to consider inheritance tax (IHT) or

stamp duty land tax (SDLT) issues. (10 marks)

You should assume that the tax rates and allowances for the tax year 2005/06 apply throughout this question.

点击查看答案

第5题

None of the following statements is true except ______.A.initial public offerings will dil

None of the following statements is true except ______.

A.initial public offerings will dilute each shareholder's existing holding

B.additional floats of companies stock will dilute each shareholder's existing holding

C.compared with additional floats, initial public offerings are more common in the new issues market for equities

D.initial public offerings usually involve offerings of shares of larger, more mature companies seeking additional equity capital

点击查看答案

第6题

(c) For commercial reasons, Damian believes that it would be sensible to place a new holdi

(c) For commercial reasons, Damian believes that it would be sensible to place a new holding company, Bold plc,

over the existing company, Linden Limited. Bold plc would also be unquoted and would acquire the existing

Linden Limited shares in exchange for the issue of its own shares.

If the new structure is implemented, Bold plc will provide management services to Linden Limited, but the

amount that will be charged for these services is yet to be determined.

Required:

(i) State the capital gains tax (CGT) issues that Damian should be aware of before disposing of his shares

in Linden Limited to Bold plc. Your answer should include details of any conditions that will need to be

satisfied if an immediate charge to tax is to be avoided. (4 marks)

点击查看答案

第7题

3 You are the manager responsible for the audit of Volcan, a long-established limited liab
ility company. Volcan operates

a national supermarket chain of 23 stores, five of which are in the capital city, Urvina. All the stores are managed in

the same way with purchases being made through Volcan’s central buying department and product pricing, marketing,

advertising and human resources policies being decided centrally. The draft financial statements for the year ended

31 March 2005 show revenue of $303 million (2004 – $282 million), profit before taxation of $9·5 million (2004

– $7·3 million) and total assets of $178 million (2004 – $173 million).

The following issues arising during the final audit have been noted on a schedule of points for your attention:

(a) On 1 May 2005, Volcan announced its intention to downsize one of the stores in Urvina from a supermarket to

a ‘City Metro’ in response to a significant decline in the demand for supermarket-style. shopping in the capital.

The store will be closed throughout June, re-opening on 1 July 2005. Goodwill of $5·5 million was recognised

three years ago when this store, together with two others, was bought from a national competitor. It is Volcan’s

policy to write off goodwill over five years. (7 marks)

Required:

For each of the above issues:

(i) comment on the matters that you should consider; and

(ii) state the audit evidence that you should expect to find,

in undertaking your review of the audit working papers and financial statements of Volcan for the year ended

31 March 2005.

NOTE: The mark allocation is shown against each of the three issues.

点击查看答案

第8题

1 Rowlands & Medeleev (R&M), a major listed European civil engineering company, wa

1 Rowlands & Medeleev (R&M), a major listed European civil engineering company, was successful in its bid to become

principal (lead) contractor to build the Giant Dam Project in an East Asian country. The board of R&M prided itself in

observing the highest standards of corporate governance. R&M’s client, the government of the East Asian country, had

taken into account several factors in appointing the principal contractor including each bidder’s track record in large

civil engineering projects, the value of the bid and a statement, required from each bidder, on how it would deal with

the ‘sensitive issues’ and publicity that might arise as a result of the project.

The Giant Dam Project was seen as vital to the East Asian country’s economic development as it would provide a

large amount of hydroelectric power. This was seen as a ‘clean energy’ driver of future economic growth. The

government was keen to point out that because hydroelectric power did not involve the burning of fossil fuels, the

power would be environmentally clean and would contribute to the East Asian country’s ability to meet its

internationally agreed carbon emission targets. This, in turn, would contribute to the reduction of greenhouse gases

in the environment. Critics, such as the environmental pressure group ‘Stop-the-dam’, however, argued that the

project was far too large and the cost to the local environment would be unacceptable. Stop-the-dam was highly

organised and, according to press reports in Europe, was capable of disrupting progress on the dam by measures such

as creating ‘human barriers’ to the site and hiding people in tunnels who would have to be physically removed before

proceeding. A spokesman for Stop-the-dam said it would definitely be attempting to resist the Giant Dam Project when

construction started.

The project was intended to dam one of the region’s largest rivers, thus creating a massive lake behind it. The lake

would, the critics claimed, not only displace an estimated 100,000 people from their homes, but would also flood

productive farmland and destroy several rare plant and animal habitats. A number of important archaeological sites

would also be lost. The largest community to be relocated was the indigenous First Nation people who had lived on

and farmed the land for an estimated thousand years. A spokesman for the First Nation community said that the ‘true

price’ of hydroelectric power was ‘misery and cruelty’. A press report said that whilst the First Nation would be unlikely

to disrupt the building of the dam, it was highly likely that they would protest and also attempt to mobilise opinion in

other parts of the world against the Giant Dam Project.

The board of R&M was fully aware of the controversy when it submitted its tender to build the dam. The finance

director, Sally Grignard, had insisted on putting an amount into the tender for the management of ‘local risks’. Sally

was also responsible for the financing of the project for R&M. Although the client was expected to release money in

several ‘interim payments’ as the various parts of the project were completed to strict time deadlines, she anticipated

a number of working capital challenges for R&M, especially near the beginning where a number of early stage costs

would need to be incurred. There would, she explained, also be financing issues in managing the cash flows to R&M’s

many subcontractors. Although the major banks financed the client through a lending syndicate, R&M’s usual bank

said it was wary of lending directly to R&M for the Giant Dam Project because of the potential negative publicity that

might result. Another bank said it would provide R&M with its early stage working capital needs on the understanding

that its involvement in financing R&M to undertake the Giant Dam Project was not disclosed. A press statement from

Stop-the-dam said that it would do all it could to discover R&M’s financial lenders and publicly expose them. Sally

told the R&M board that some debt financing would be essential until the first interim payments from the client

became available.

When it was announced that R&M had won the contract to build the Giant Dam Project, some of its institutional

shareholders contacted Richard Markovnikoff, the chairman. They wanted reassurance that the company had fully

taken the environmental issues and other risks into account. One fund manager asked if Mr Markovnikoff could

explain the sustainability implications of the project to assess whether R&M shares were still suitable for his

environmentally sensitive clients. Mr Markovnikoff said, through the company’s investor relations department, that he

intended to give a statement at the next annual general meeting (AGM) that he hoped would address these

environmental concerns. He would also, he said, make a statement on the importance of confidentiality in the

financing of the early stage working capital needs.

(a) Any large project such as the Giant Dam Project has a number of stakeholders.

Required:

(i) Define the terms ‘stakeholder’ and ‘stakeholder claim’, and identify from the case FOUR of R&M’s

external stakeholders as it carries out the Giant Dam Project; (6 marks)

点击查看答案

第9题

3 Palm plc recently acquired 100% of the ordinary share capital of Nikau Ltd from Facet Lt
d. Palm plc intends to use

Nikau Ltd to develop a new product range, under the name ‘Project Sabal’. Nikau Ltd owns shares in a non-UK

resident company, Date Inc.

The following information has been extracted from client files and from a meeting with the Finance Director of Palm

plc.

Palm plc:

– Has more than 40 wholly owned subsidiaries such that all group companies pay corporation tax at 30%.

– All group companies prepare accounts to 31 March.

– Acquired Nikau Ltd on 1 November 2007 from Facet Ltd, an unrelated company.

Nikau Ltd:

– UK resident company that manufactures domestic electronic appliances for sale in the European Union (EU).

– Large enterprise for the purposes of the enhanced relief available for research and development expenditure.

– Trading losses brought forward as at 1 April 2007 of £195,700.

– Budgeted taxable trading profit of £360,000 for the year ending 31 March 2008 before taking account of ‘Project

Sabal’.

– Dividend income of £38,200 will be received in the year ending 31 March 2008 in respect of the shares in Date

Inc.

‘Project Sabal’:

– Development of a range of electronic appliances, for sale in North America.

– Project Sabal will represent a significant advance in the technology of domestic appliances.

– Nikau Ltd will spend £70,000 on staffing costs and consumables researching and developing the necessary

technology between now and 31 March 2008. Further costs will be incurred in the following year.

– Sales to North America will commence in 2009 and are expected to generate significant profits from that year.

Shares in Date Inc:

– Nikau Ltd owns 35% of the ordinary share capital of Date Inc.

– The shares were purchased from Facet Ltd on 1 June 2003 for their market value of £338,000.

– The sale was a no gain, no loss transfer for the purposes of corporation tax.

– Facet Ltd purchased the shares in Date Inc on 1 March 1994 for £137,000.

Date Inc:

– A controlled foreign company resident in the country of Palladia.

– Annual chargeable profits arising out of property investment activities are approximately £120,000, of which

approximately £115,000 is distributed to its shareholders each year.

The tax system in Palladia:

– No taxes on income or capital profits.

– 4% withholding tax on dividends paid to shareholders resident outside Palladia.

Required:

(a) Prepare detailed explanatory notes, including relevant supporting calculations, on the effect of the following

issues on the amount of corporation tax payable by Nikau Ltd for the year ending 31 March 2008.

(i) The costs of developing ‘Project Sabal’ and the significant commercial changes to the company’s

activities arising out of its implementation. (8 marks)

点击查看答案

第10题

3、BN、MgO及BaO的熔点依次降低
点击查看答案
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信