After a baseline check was completed it was noted that the network was working far below t

helevel of the last baseline.Which of the following should the technician do NEXT to determine where the network problems are occurring?()

A. Upgrade the firmware on all routers and switches

B. Reboot the entire network one device at a time

C. Conduct a network traffic analysis

D. Rerun the baseline to ensure the results were correct

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“After a baseline check was com…”相关的问题

第1题

A project manager believes that modifying the scope of the project may provide added value
service for the customer.The project manager should______.

A.assign change tasks to project members

B.call a meeting of the configuration control board

C.change the scope baseline

D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第2题

A project manager believes that modifying the scope of the project may provide added value
service for the customer.The project manager should______.

A.assign change tasks to project members

B.call a meeting of the configuration control board

C.change the scope baseline

D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第3题

A project manager believes that modifying the scope of the project may provide added value
for the customer. The project manager should:

A.Change the scope baseline

B.Prepare a variance report

C.Call a meeting of the configuration control board

D.Change the project's objectives

E.Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第4题

● A project manager believes that modifying the scope of the project may provide added val
ue service for the customer. The project manager should(75).

(75)

A.assign change tasks to project members

B.call a meeting of the configuration control board

C.change the scope baseline

D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第5题

● A project manager believes that modifying the scope of the project may provide added val
ue service for the customer. The project manager should(75).

(75)

A.assign change tasks to project members

B.call a meeting of the configuration control board

C.change the scope baseline

D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第6题

● A project manager believes that modifying the scope of the project may provide added val
ue service for the customer .The project manager should()()A. assign change tasks to project membersB. call a meeting of the configuration control boardC. change the scope baselineD. postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第7题

66A project manager believes that modifying the scope of the project may provide added val

66 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A. Change the scope baseline

B. Prepare a variance report

C. Call a meeting of the configuration control board

D. Change the project's objectives

E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第8题

●A project manager believes that modifying the scope of the project may provide added valu

● A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A Change the scope baseline

B Prepare a variance report

C Call a meeting of the configuration control board

D Change the project's objectives

E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第9题

148A project manager believes that modifying the scope of the project may provide added va

148 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

A. Change the scope baseline

B. Prepare a variance report

C. Call a meeting of the configuration control board

D. Change the project's objectives

E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

点击查看答案

第10题

The following command is executed to create the baseline template:Which statement is true about the effect of the above command?()

A. It creates a baseline template that never expires.

B. It produces an error because no snapshot information is provided to create the baseline.

C. It creates a baseline template that expires after the Automatic Workload Repository (AWR) retention period.

D. It creates a repeating baseline template that repeats after the Automatic Workload Repository (AWR) retention period.

点击查看答案
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
温馨提示
每个试题只能免费做一次,如需多次做题,请购买搜题卡
立即购买
稍后再说
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
赏学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反赏学吧购买须知被冻结。您可在“赏学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
赏学吧
点击打开微信