23 Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:
A. Baseline costs
B Budgeted costs.
C. Estimates upon completion costs
D. Scheduled costs
E. None of the above
第4题
A.WOULD YOU PLEASE PAY TO ABC COMPANY USD 1, 0000.00
B.PLASE PAY ABC COMPANY USD 1,000.00 PROVIDED ABC COMPANY SHIPPED GOODS AS SCHEDULED
C.PLEASE PAY ABC COMPANY USD 1,000.00 WHEN WE RECERIVE COMMISSION
D.PLEASE PAY ABC COMPANY USD 1,000.00
第5题
A.WOULD YOU PLEASE PAY TO ABC COMPANY USD 1, 0000.00
B.PLASE PAY ABC COMPANY USD 1,000.00 PROVIDED ABC COMPANY SHIPPED GOODS AS SCHEDULED
C.PLEASE PAY ABC COMPANY USD 1,000.00 WHEN WE RECERIVE COMMISSION
D.PLEASE PAY ABC COMPANY USD 1,000.00
第6题
Linda: Yes, Mr. Taylor. We will use the conference room (答案?)for the meeting.
John: Thats right. The meeting is very important. Where shall the guests gather before the meeting begins?
Linda: (答案?) . Its spacious there.
John: We will have several foreign guests (答案?).
Linda: I have arranged for an interpreter to be present. But it is said these foreigners can speak English.
John: Really? I will also try to speak slowly. How will you arrange (答案?) , Linda?
Linda: We have prepared the name cards to be put (答案?) for guests to sit by. What time would you like refreshments, Mr. Taylor?
John: Well, after my report, there will be a break for refreshments.
Linda: All right, I see.
A. from Spainon
B. on the second floor
C.on the conference table
D.In the VIP lounge
E.the guests seats
第7题
阅读理解
阅读下面的文章,根据文章内容判断文章后的句子是正确(T)还是错误(F)。(每题10分)
ROAD CLOSURE PROCEDURES IN SYDNEY
To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.
Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.
Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.
If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.
操作提示:句子正确选择下拉选项框为“T”;句子错误选择下拉选项框为“F”。
1. Closures scheduled for Sundays on minor roads outside the city center may be considered. {T; F}
2. You need to get approval if you plan to block the road or footpath. {T; F}
3. Roads can only be closed partially. {T; F}
4. If you choose an existing route for a parade, the amount of planning will be reduced. {T; F}
5. Road closure applications can be sent to the Department's Traffic Calming Committee one week before the scheduled date. {T; F}
第8题
阅读理解
阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)
ROAD CLOSURE PROCEDURES IN SYDNEY
To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.
Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.
Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.
If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.
操作提示:通过题干后的下拉框选择题目的正确答案。
1. As a rule, Sydney's highway department will agree to road closures in the city centre scheduled for __________. {A; B; C}
A. weekdays
B. Saturdays
C. Sundays
2. If you want a road closed to traffic, you must complete your applications and send them to the relevant committee at least__________ before the scheduled date. {A; B; C}
A. a week
B. 30 days
C. two months
3. Partial of full road closures are decided by _________. {A; B; C}
A. the requirements from applicants
B. the traffic flow
C. the road conditions
4. Which is NOT the condition for partial road closures according to the passage? {A; B; C}
A. In light traffic areas.
B. On work days.
C. There will be at least 1 lane for traffic during the work.
5. Which is the best title of this passage? {A; B; C}
A. Road Closure Procedures in Sydney
B. Road Conditions in Sydney
C. Road Management in Sydney
第9题
Now I do not think software (72) have less inherent courage and firmness than chefs, nor than other engineering managers. But false (73) to match the patron's desired date is much more common in our discipline than elsewhere in engineering. It is very (74) to make a vigorous, plausible, and job risking defense of an estimate that is derived by no quantitative method, supported by little data, and certified chiefly by the hunches of the managers.
Clearly two solutions are needed. We need to develop and publicize productivity figures, bug-incidence figures, estimating rules, and so on. The whole profession can only profit from (75) such data. Until estimating is on a sounder basis, individual managers will need to stiffen their backbones and defend their estimates with the assurance that their poor hunches are better than wish derived estimates.
71
A. no
B.the same
C.other
D.lots of
第10题
【C1】
A.taken
B.pieced
C.kept
D.made
为了保护您的账号安全,请在“赏学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!